Salta al contenuto principale

Total cost of ownership: Cost Savings for Oracle Database on GCE

Oracle Configuration
BYOL Standard Per-Core License
Oracle ULA Unlimited License Agreement
Enterprise Edition processor count assumes multithreading is enabled (2 vCPUs = 1 Oracle processor license).
N2 is compared using Hyperdisk Extreme. Extreme requires n2-highmem-80 or larger. Hyperdisk Balanced is not a standard N2 disk.
Storage & Performance Demands
Database Capacity:
TB (5,000 GiB)
0.5 TB Max: 128 TB
Target IOPS:
IOPS
10,000 Max: 160,000 IOPS
Target Throughput:
MiB/s
200 MiB/s Max: 5,120 MiB/s
Sizing Dynamics:

Calculating sizing limits...

3-Year Net Savings +$1,014,547 75.1% Lower
Monthly Savings +$28,182/mo Storage delta: +$2,821/mo
Compute Footprint
4 vCPU vs 32 vCPU
Saves 28 vCPUs
3Y Total Spend
GCNV: $336,846 HD: $1,351,393
3-Year Total Cost Comparison
Google Compute Engine + Hyperdisk Extreme $1,351,393
Google Compute Engine + Google Cloud NetApp Volumes (GCNV) $336,846
Oracle License
Oracle Support
GCE Compute
Storage (Capacity, IOPS, Throughput)
Detailed Cost Breakdown 3-Year TCO Comparison
Cost ComponentHyperdisk Extreme (Monthly)GCNV (Monthly)Hyperdisk Extreme (3-Year)GCNV (3-Year)3Y Net Difference
Google Compute Engine VM$1,530.24$191.28$55,089$6,886+$48,203
Storage: Capacity$400.00$525.00$14,400$18,900-$4,500
Storage: IOPS Provisioning$500.00$1,700.00$18,000$61,200-$43,200
Storage: Throughput Provisioning$64.00$2,560.00$2,304$92,160-$89,856
Oracle Processor License (Amortized)$21,111.11$2,638.89$760,000$95,000+$665,000
Oracle Annual Software Support$13,933.33$1,741.67$501,600$62,700+$438,900
Total TCO (3-Year)$37,538.68/mo$9,356.84/mo$1,351,393$336,846+$1,014,547 (75.1%)
Note: Illustrative only. Enterprise Edition processor counts assume multithreading is enabled (2 vCPUs = 1 Oracle processor license). Standard Edition 2 is licensed per socket (every 4 vCPUs, rounded up, equals 1 socket) and only on instances of up to 8 vCPUs. Customers are responsible for validating Oracle licensing and support requirements. TCO estimates are based on model assumptions and public list prices. Final sizing, architecture, and pricing should be confirmed with NetApp and Google Cloud solution teams.