NS0-502 SAN Implementation Exam Objectives
SAN Solution Assessment
- Meet the prerequisites for installation of NetApp system and switches.
- Collect the information required to configure NetApp systems.
- List a detailed inventory of SAN components.
SAN Implementation Plan Creation
- Verify and plan for dual power feeds for all components.
- Create and interpret cabinet diagrams.
- Create connectivity diagram.
- Plan Storage controller configuration.
- Plan Host configuration.
- Create snapshot plan.
- Plan Ethernet switch configuration.
- Plan zoning configuration.
- Plan iSCSI configuration.
SAN Implementation
- Prepare site for installation.
- Follow the rack diagram, install systems and FC switches.
- Perform basic power tests for all equipment.
- Configure NetApp Storage Systems.
- Configure FC Switches.
- Configure Ethernet Switches.
- Configure Hosts.
SAN Implementation Testing
- Create an acceptance test plan.
- Test host to storage connectivity (native Vol mgr, file system).
- Test LUN availability during failover scenarios (multipathing).
- Test controller failover scenarios (multipath HA).